+2-012-4047603, +2-050-2333973, +2-02-6353551
Egypt – Cairo – Heliopolis
14 Elkhalefa Elmansour St. Safeer Sq. - Apt 7
|
PERSONAL DETAILS Date of Birth: 31-8-1974 Marital Status: Single Religion: Muslim Nationality: Egyptian Passport No: 2886654 |
|
ACADEMIC QUALIFICATION Institute: Helwan University -Mataria Engineering Faculty – Cairo -Egypt Description: B.Sc. Mechanical Engineering I.T Knowledge: Linux,Office applications , AutoCAD, Photoshop. Languages: Excellent Spoken and Written English & Arabic |
|
EMPLOYMENT HISTORY |
|
|
From / to: |
Employer: East Delta Electricity Production Company – Mansora - Egypt |
|
Jan 2005-tell now |
Description: Joining the preparation team for new project 750 MW combined cycle. Studying scope of work , submittal, drawings and in site follow up installation and commissioning tell operation to grid. 2X250 MW V94.3a Siemens Gas Turbine will be in commercial operation on August 2006
|
|
Apr 2003- Jan 2005 |
Description: Combined Cycle Shift engineer operating plant equipments including startup, shutdown, control, monitoring and defects reporting. The project consists of 8 HRSG (Vogt Co. made, 54 T/H, 52 bar, DMC Controlled) Feed water pumps (250 HP,82 bar) Operation of 2 x 50 MW GE Steam Turbine STAG 405 SpeedTronic & Mark III controlled DCS. Operation of plant electrical system (3.3 KV switch gear & auxiliary transformers) Pump house (670 HP, 11200 T/H) Condenser cooling pumps, Raw & chlorine pumps, BOP & MAC equipments (Air compressors, Hydraulic system
|
|
Jan 2002- Apr 2003 |
Description: Gas Turbine P.P Operation of 8 x 25 MW GE F5 Gas Turbine power plant equipment & their auxiliaries SpeedTronic Mark II control system. Operating & maintaining the power plant with the maximum availability. Observing job progresses, hence reporting to concerned regarding conditions noted and actions taken Implementing preventative and corrective maintenance procedures, troubleshooting actual and potential problems areas and implementing viable solutions. Raising defects for equipment & doing isolation according to the work order permit. Operation of electrical system (220 KV Switch gear & 11.5/220 KV Transformers) Abnormal & Emergency operations & Startup & Shutdown of Power Plant Units. Handling plant fire fighting & fuel system.
|